700字范文,内容丰富有趣,生活中的好帮手!
700字范文 > 工后沉降量 settlement after construction英语短句 例句大全

工后沉降量 settlement after construction英语短句 例句大全

时间:2021-01-23 03:53:30

相关推荐

工后沉降量 settlement after construction英语短句 例句大全

工后沉降量,settlement after construction

1)settlement after construction工后沉降量

1.Based on the site settlement information of soft soil highway section of Nan Rao Cheng highway of Yangzhou city, thesettlement after construction of every stage is forecasted by the method of hyperbola.根据扬州市南绕城公路软土路段的实测沉降资料 ,采用双曲线法预测各施工阶段测点的沉降和工后沉降量 ,为路面结构层的铺设及间歇期的确定提供了依

2)post construction settlement工后沉降

1.Discussion on application of preloading method in soft groundpost construction settlement;浅议预压法解决软土地基工后沉降

2.Estimation ofpost construction settlement of ground with vertical drains;竖向排水井地基工后沉降预测

3.The experimental research ofpost construction settlement observation of railway roadbed;铁路路基工后沉降观测的试验研究

英文短句/例句

1.Settlement Analysis for Soft Foundation and Prediction of Post-construction Settlement on High Way;高速公路软土地基沉降分析及工后沉降预测

2.The Statistical Analysis on Completion Settlement and Last Project Settlement with Cement-soil Mixing Pile to Deal With Embankment水泥土搅拌桩处理的路堤填筑期竣工沉降与工后沉降统计分析

3.Multi-objective Optimal Combination Forecast of Post-construction Settlement of Embankment路基工后沉降的多目标优化组合预测

4.Method for controlling the settlement of soft ground afterconstruction ofShi-An Expressway石安高速公路软基工后沉降控制方法

5.Analysis of the Settlement Stability of High-Speed Railway Subgrade on Soft Ground and Its Prediction of the Post-Construction Settlement;高速铁路软土地基路基沉降稳定分析及工后沉降预测

6.Research on Post-Construction Settlement Prediction of Soft Ground Road Embankment Improved by DJM Pile;粉喷桩处理公路软基工后沉降的预测研究

7.Analysis of Stability on High Emembankmentment of High-Speed Railway and Predict on Settlement after Construction;高速铁路高路堤稳定性分析及工后沉降预测

8.The Evaluation of Embankment Quality and Study on Control of Post-Load Settliment in Cheng-Ya Express Highway;成雅高速路堤质量评估与工后沉降控制的研究

9.Discussion of Computing Settlement Beyond Construction of Pile-Group Foundation of Bridge in Qin-Shen Dedicated Passenger Line;秦沈客运专线桥梁桩基工后沉降计算方法探讨

10.Time-depended Back-analysis and Prediction of Post-construction Settlement for Embankment in Soft Clay;软土地基路堤工后沉降时参反演与预测

11.Inverse Analysis and Forecast of the Post-construction Settlement with Drainage Consolidation Method on Soft Foundation;排水固结加固软基工后沉降反分析与预测

12.Numerial Analysis of Effect of Surcharge Preloading on Post-construction Settlement of Embankment on Soft Ground软基路堤超载预压对工后沉降影响的数值分析

13.Numerical analysis on post-construction settlement of pile group foundation for Taizhou Yangtze River Bridge泰州长江大桥群桩基础工后沉降数值分析

14.Parameter conversion and settlement estimation based on nonlinear variation of parameters in soft clay深厚软土工后沉降预测及其参数的反分析

15.Reliability Analysis of Soft Ground Post-construction Settlements Based on Monte-Carlo Method基于Monte-Carlo法的软土路基工后沉降可靠性分析

16.Power-polynomial prediction and analysis of post-construction settlement of embankment on soft ground软基路堤工后沉降的幂多项式预测与分析

17.The Prediction of Post-Construction Sedimentation on Pile-group Foundation Based on the Grey Theory基于灰色理论的桥梁群桩基础工后沉降预测

parison of post-construction settlement prediction method of expressway soft soil roadbed高速公路软土路基工后沉降推算方法的比较

相关短句/例句

post construction settlement工后沉降

1.Discussion on application of preloading method in soft groundpost construction settlement;浅议预压法解决软土地基工后沉降

2.Estimation ofpost construction settlement of ground with vertical drains;竖向排水井地基工后沉降预测

3.The experimental research ofpost construction settlement observation of railway roadbed;铁路路基工后沉降观测的试验研究

3)post-construction settlement工后沉降

1.Influence factors onpost-construction settlement of high backfills adjacent to abutment;桥台后高填方路堤工后沉降影响因素分析

2.Analysis of negative effect of geotextile on long-term stability andpost-construction settlement of embankment;土工合成材料对路堤长期稳定性及工后沉降的负面影响分析

3.Numerical analysis onpost-construction settlement of pile group foundation for Taizhou Yangtze River Bridge泰州长江大桥群桩基础工后沉降数值分析

4)settlement after construction工后沉降

1.Study on the interface height of embankment and bridge for high speed railway based on thesettlement after construction of subgrade in soft soil zone;高速铁路软土路基工后沉降对桥路分界高度的影响研究

2.Soft groundsettlement after construction prediction with flat dilatometer test;用扁铲侧胀试验计算软基处理工后沉降

3.In order to keep track even and steady in high speed railway,it is necessary for no embankmentsettlement after construction;but red beds are easy to collapse and soften,which belongs to stuffing for the third grade.为了保持轨道的平顺性和稳定性,高速铁路要求路堤的工后沉降为0。

5)residual settlement工后沉降

1.Deformation of sheet plate due toresidual settlement ofpile-net composite foundation;桩—网复合地基工后沉降的薄板理论解

2.Three Point Calculation Method of Residual Settlement About Pile-Net Composite Foundation;三点法推算桩—网复合路基工后沉降量

3.The pile-supported embankment is a new embankment structure introduced into China recently,which can control theresidual settlement of the embankment reasonably and effectively and has a wide application prospect.桩承式路堤是近年来引入国内的一种合理有效的控制路堤工后沉降的新型路堤结构形式,有着广泛的应用前景。

6)post-load settlement工后沉降

1.Application of data processing methods in prediction of roadheadpost-load settlement;数据处理方法在路堤工后沉降预测中的应用

2.Prediction of thepost-load settlement of high embankment by artificial neural network;用人工神经网络模型预测高填方地基工后沉降

延伸阅读

胶乳沉降量分子式:CAS号:性质:配合剂分散体于规定条件下,在单位时间及单位面积上沉降的量。它是衡量胶乳用配合剂分散体稳定性的重要指标。为防止分散体的沉淀需加入适量分散剂,保护胶体并进行充分研磨分散。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。