700字范文 > 电站增容改造 reformation for capacity expansion of hydropower station英语短句 例句大全

电站增容改造 reformation for capacity expansion of hydropower station英语短句 例句大全

时间:2020-11-05 16:29:31

相关推荐

电站增容改造 reformation for capacity expansion of hydropower station英语短句 例句大全

电站增容改造,reformation for capacity expansion of hydropower station

1)reformation for capacity expansion of hydropower station电站增容改造

英文短句/例句

1.Operation Stability of Gezhouba Hydropower Station after its Capacity Increasing葛洲坝电站增容改造机组运行稳定性介绍

2.Runner structural design for hydropower station upgrade project浅谈水电站增容改造中的转轮结构设计

3.Retrofit and Design of Increasing Capacity and Cavitation Resistance of Hydraulic Turbine for Guanan Gaoqiao Power Station;广安高桥水电站水力机组增容防蚀改造设计

4.The Key Technology Research of Unit increasing Capacity Rebuilding for GHPP and Project Management;葛洲坝电站机组增容改造关键技术研究及工程项目管理

5.Enlarge Capacity and Synthetic Robotizating Reconstruction for Jing Lun 110 kV Transformer Substation腈纶110kV变电站扩容及综合自动化改造

6.System Optimization Uprating Modification for 300MW Units in Yudong Power Plant裕东电厂300MW机组系统优化与增容改造

7.The Research of Rehabilitating and Enhancing for Hydroelectric Set in Liujiaxia Hydropower Plant;刘家峡水电厂水轮发电机组增容改造分析研究

8.Capability-increasing Transformation for 310MW generator in Qinshan Nuclear Power Co. Ltd.秦山核电310MW发电机增容改造的工程实践

9.Updating and Retrofitting Capacity of QFS Type 300MW Turbo-Generator and Its DCS Reconstruction;QFS型300MW汽轮发电机增容及其DCS系统改造

10.Research on the Capacity Increase and Transformation of Generators Based on the Engineering Practice;基于工程实践的汽轮发电机组增容改造的研究

11.The Feasible Research of the Capacity Improvement for the 100MW Unit of LianCheng Power Station;连城电厂100MW汽轮机节能和增容改造可行性研究

12.Force Characteristic Test Technology and Application on Capacity-plus Transformation of Hydroelectric Generating Set水轮发电机组增容改造力特性测试技术及应用

13.The use of Hydraulic Fill Techniques on the Market for Power Plant Ash Transformation Compatibilizer采用水力冲填法对发电厂贮灰场进行增容改造

14.Conductor Selection for ±500 kV Jiyang Large Crossing Transmission Line Upgrading±500kV吉阳大跨越输电线路增容改造导线选择

15.Better approach to save energy and increase efficiency for mini-hydropower station:technical improvement of Jingmenkou II and Manhai Hydropower Stations小水电站节能增效的好途径——记箐门口二级水电站和漫海水电站技术改造

16.Hydraulic Turbine Model Acceptance Test of No.2 Unit of Xinanjiang Hydropower Station新安江水电厂2#机增容改造水轮机模型验收试验

17.Capacity-increasing Rebuilding Syudies and Construction Analysis on 3rd Generator of Gezhouba;葛洲坝3号发电机增容改造研究及施工技术分析

18.Study on Asymmetry Three Governors of Electric Control System for Wujiang Hydroelectric Plant, Guizhou Province, China;乌江渡增容改造250MW机组非对称三机调速器电气控制系统研究

相关短句/例句

capacity-increasing transformation in 220 kV substation220kV变电站增容改造

3)capacity extension增容改造

1.The technical measures forcapacity extension of 125 MW hydropower units of Gezhouba hydropower station are described.介绍了葛洲坝电站125 MW水轮发电机组增容改造的技术措施。

2.Thecapacity extension cases of hydroturbines(HL211,HL702,ZZ587,ZZ105,PO123) in Hubei province are described;in addition,several relevant problems and suggestions for implementingcapacity extension of hydroturbine are proposed.简述了湖北省5个水电厂水轮机(HL211、HL702、ZZ587、ZZ105、PO123)改造增容的实例;提出了增容改造实施中的几个具体问题及建议。

4)uprating增容改造

1.Shafting abnormal vibration fault usually arises after theuprating on turbo-generator unit.机组增容改造后易发生轴系异常振动。

5)upgrading[英]["?pgreid][美]["?p"gred]增容改造

1.According to the actual operation parameters of Fengman hydropower plant,the runner A835b had been developed by numerical analysis and had been used for theupgrading of unit 3 in the power station.经过电站原型机实测表明:新机组出力、效率、运行稳定性等各项性能指标达到机组增容改造技术协议的要求。

2.Theupgrading scheme of runner of No.对新安江电站2#机增容改造方案进行了分析和论证,以A765转轮为基础转轮,利用CFD进行改型分析计算,在较短时问内确定了转轮及导叶的改型方案,最后通过试验证实各项指标达到了电站改造的要求。

3.Large crossing linesupgrading requires higher acceptable temperature rise and load current of the conductor,as well as satisfies safe clearance requirements without incurring more tower loadings.大跨越输电线路的增容改造,需要在不增加跨越直线塔荷载的情况下,提高导线的允许温升和载流量,并且满足安全距离的要求,特强钢芯高强耐热铝合金导线是较为理想的选择。

6)upgrade[英][,?p"ɡre?d][美]["?p"gred]增容改造

1.Runner structural design for hydropower stationupgrade project浅谈水电站增容改造中的转轮结构设计

2.Based on comparison of five alternatives,theupgrade measures for No.山美水电站1#,2#机组增容改造经5个方案比选后,采用更换定子铁芯、定子绕组、转子磁极线圈,并将绝缘等级提高到F级,并改造通风冷却系统,在保持原水电站水工建筑、引水管道、蜗壳、固定导叶、导叶、尾水管、主轴等大件基本不改变的条件下,重新设计、研制新转轮的方案,实施后,单机出力由15 MW增至16。