700字范文 > 盖挖法 Covered excavation英语短句 例句大全

盖挖法 Covered excavation英语短句 例句大全

时间:2020-05-01 15:54:04

相关推荐

盖挖法 Covered excavation英语短句 例句大全

盖挖法,Covered excavation

1)Covered excavation盖挖法

1.A covered excavation was adopted, which not only eliminated the problem of traffic blockage but also protected the adjacent buildings and services above the foundation pit, with much shorter construction period.通道采用了盖挖法施工 ,既解决了地面全断面行车 ,又确保基坑上部管线及邻近建筑物的安全 ,减少了基坑施工周期。

bined with shallow tunnel of Maoshan west tunnel,this paper compares the covered excavation with open-cut method on technology and economy.并对盖挖法施工方案及施工工艺进行了介绍。

英文短句/例句

1.On Design Method of Temporary Pavement and Bridge System by the Cover-excavation Method盖挖法临时路桥体系的设计方法研究

2.Assessment of Construction Methods the Top-Down and Excavation under Cover Board Used in Harbin Subway HLJ Univ. Station;哈地铁黑大站逆作与盖挖法评价研究

3.Application and Construction Technology of Covered Excavation in Shallow Tunnel隧道浅埋段盖挖法的应用与施工技术

4.Construction Technology of Cover-cut Method in Shallow-buried Portal Section of Houyuntai Mountain Tunnel后云台山隧道洞口浅埋段盖挖法施工技术

5.Semi-covered Excavation Scheme for Niuwangmiao Station on Chengdu Metro Line 2成都地铁2号线牛王庙车站半盖挖法设计

6.Application of Two Tunnel Boring Projects Based on Environmental Friendly Views“零仰坡”进洞法与盖挖法在环保型隧道施工中的应用

7.THE CAP AND EXCAVATION METHOD USED IN UNDERGROUND HEATING POWER PIPELINE PASSING THROUGH ROADINTERSECTION盖挖法用于热力管网穿越道路的设计与施工研究

8.Research on Key Technologies of the Design and Construction about Temporary Road-bridge System in Cover-excavation Metro盖挖法地铁施工临时路桥体系设计与施工的关键技术研究

9.Covered Excavation of a Large-span Tunnel in Proximity of Existing Buildings“盖挖法”在近接既有建筑物的大跨隧道施工中的应用

10.Cut and cover method明挖覆盖法(隧道)

11.Monitoring and Analysis on Cover-Excavation Consequent Operation of Metro Station;地铁车站盖挖顺作法施工监控量测与分析

12.The Research on Mining Algorithm of Association Rules Based on Attributes Covering;基于属性覆盖的关联规则挖掘算法研究

13.Analysis and Study on Flat Slab with Opening for Cover and Excavation Top-Down Method;盖挖逆作法施工中预留孔洞的分析与研究

14.Analysis on Covered Top-down Excavation Technique Adopted in Practical;盖挖逆作法施工技术在某工程中的实践分析

15.Construction Technique of Intermediate Pile for Subway Station with Top-Down Inverse Method盖挖逆作法地铁车站的中间桩施工技术

16.On the construction technique of the cover and excavation top-down method in the reconstruction project for Suzhou railway station苏州火车站改造工程盖挖逆作法施工技术

17.Calculation of Construction Load in Cover-cut Method and Analysis of Neighboring Building"s Displacement盖挖施工荷载确定方法及邻近建筑结构变形分析

18.Cover and Cut Method and Finite Element Analysis of Comprehensive Transportation in Futian Subway Station深圳市福田站地下综合交通枢纽工程配套设施盖挖逆作施工方法与结构整体有限元分析

相关短句/例句

cover-cut method盖挖法

1.A new type ofcover-cut method is successfully applied to construction of the rail transit station in the soft ground of Shanghai, which uses the standard and modulus recyclable and reusable temporary pavement system in the soft ground area, with the first support of reinforced concrete also for the support structure of the temporary pavement.软土地区采用标准化、模数化的可回收重复利用临时路面系统和首道支撑采用钢筋混凝土兼作临时路面支承结构的新型盖挖法,在上海轨道交通车站建设中获得成功。

2.This paper presents the method for construction load determination incover-cut method.研究表明盖板全铺设施工导致的建筑底板附加沉降量最大,较非盖挖法大21%;盖板全铺设施工对坑底隆起控制能力最强,开挖完成后坑底隆起较非盖挖法小7。

3.Based on characteristics of shallow-buried portal section and adjacent existing buildings,cover-cut method is adopted in Houyuntai Mountain Tunnel.针对后云台山隧道右线洞口段埋深浅、邻近既有建筑物的特点,采用盖挖法施工。

3)top-down method盖挖法

1.Discussion on thetop-down method of the foundation support technology;浅谈盖挖法基坑支护技术

4)excavation after covering盖挖工法

5)Semi-covered excavation method半盖挖法

6)covered excavation and sequential method盖挖顺做法