700字范文,内容丰富有趣,生活中的好帮手!
700字范文 > 长江口深水航道治理工程 Yangtze estuary deepwater channel regulation engineering英语短句 例句大全

长江口深水航道治理工程 Yangtze estuary deepwater channel regulation engineering英语短句 例句大全

时间:2024-03-23 06:29:07

相关推荐

长江口深水航道治理工程 Yangtze estuary deepwater channel regulation engineering英语短句 例句大全

长江口深水航道治理工程,Yangtze estuary deepwater channel regulation engineering

1)Yangtze estuary deepwater channel regulation engineering长江口深水航道治理工程

英文短句/例句

1.Improvement Project of Deep-Draft Channel of Yangtze Estuary长江口深水航道治理工程的设计与施工

2.Analysis of the Economic Benefit of Yangtze Estuary Deepwater Channel Regulation Project;长江口深水航道治理工程的经济效益分析

3.Study and practice of comprehensive utilization of dredging soil of the Yangtze Estuary Deepwater Channel Engineering长江口深水航道治理工程疏浚土综合利用

4.Research of Engineering GIS and the application in the regulation of YRE;工程地理信息系统及其在长江口深水航道治理工程中的应用

5.Formation of Bagged Sand Dike Core and Placing of Sand Cushion长江口深水航道治理工程袋装砂堤心成型及砂被铺设施工工艺

6.Bagged Sand Core Sloping Dike Structure and Its Design Method in Yangtze Estuary Deepwater Channel Regulation Project长江口深水航道治理工程中袋装砂堤心斜坡堤结构设计

7.Application of new type hollow-block mound breakwater in the Yangtze Estuary deepwater channel regulation project新型空心方块斜坡堤结构在长江口深水航道治理工程中的应用

8.Design of the Sloping-Faced North Leading Dike With Bagged-Sand Core for the Yangtze Estuary Deepwater Channel Regulation PhaseⅠProject长江口深水航道治理工程一期工程北导堤袋装砂堤心斜坡堤的设计

9.Semi-circular composite dikes are one of the main structures in Yangtze Estuary Channel Regulation Project.半圆体混合堤是长江口深水航道治理工程中堤坝主要结构型式之一。

10.Design and construction of the 1st & 2nd phase regulation projects of Yangtze Estuary Deepwater Channel长江口深水航道治理一、二期工程的设计与施工

11.Change of re-siltation in the Yangtze Estuary deepwater channel during 1~(st) and 2~(nd) stages长江口深水航道(一、二期工程)回淤变化

12.The first phase of the project to improve the deepwater channel at the mouth of the Yangtze River has been completed, recording a new draught of 8.5 meters.长江口深水航道整治一期工程已经完成,水深达到8.5米。

13.The design and construction of the sloping- faced north leading dike with bagged- sand core for the 1st phase of the Yangtze Estuary deepwater channel regulation project are introduced.介绍长江口深水航道治理一期工程北导堤袋装砂堤心斜坡堤的设计与施工。

14.Yangtze Estuary Deepwater Channel Scientific Experiment Centre Phase I Project;长江口深水航道科学试验中心一期工程

15.The computed results show that the flow field in the estuary changes significantly due to the project.数值模拟结果表明长江口拦门沙深水航道工程对长江口水域的流场有明显的影响。

16.The bagged sand core sloping dike structure and its design method in the Yangtze Estuary Deepwater Channel Regulation Project介绍长江口航道治理工程中袋装砂堤心斜坡堤结构及设计方法。

17.Design of Phase Ⅰ project of the Guniusha waterway channel regulation in the middle Reach of the Yangtze River长江中游牯牛沙水道航道整治一期工程设计

18.Study on Morphological Evolution and Siltation in Deep Waterway Due to Channel Re-construction in the North Passage, Yangtze Estuary;长江口深水航道河床演变与航道回淤研究

相关短句/例句

the Yangtze Estuary deepwater channel regulation project长江口深水航道治理工程一期工程

3)The first stage of Yangtze Estuary Deepwater Channel Regulation Project长江口深水航道治理一期工程

4)dredging engineering of Yangtze Estuary Deepwater Channel Regulation project长江口深水航道治理疏浚工程

5)Yangtze estuary deepwater channel长江口深水航道

1.Depending on technical innovation and strict, scientific management,the unprecedented Yangtze Estuary deepwater channel improvement project has made success under complicated and wicked natural condition.经不断探索 ,依靠技术创新和严格、科学的管理 ,史无前例的长江口深水航道治理工程在复杂、恶劣的自然条件下取得了成功。

6)deepwater channel regulation project深水航道治理工程

延伸阅读

山沟治理工程为固定沟床,防止或减轻山洪及泥石流危害而在山沟中修筑的建筑物。包括泄水式沟头防护、谷坊、拦沙坝、淤地坝、 小型水库、 沟岸防护工程等。山沟是山区小流域的排水沟道。由于山沟所在流域的地质、气候、地形、土壤、植被等自然条件以及人类活动的影响不同,山沟发生山洪、泥石流灾害的危险程度也不相同。需要根据山沟的类型选用不同的治理措施。山沟治理工程不仅要与治理沟道的林草措施相结合,而且要与山坡水土保持工程相结合,统一规划,体现坡沟兼治的原则。沿革 中国修建和利用小型蓄水工程陂塘,早在2000多年前的《禹贡》和《诗经》中已有记述。数百年以前就已在沟道中兴修谷坊、打坝淤地,进行农业生产,减轻山洪灾害。黄河中游的山区农民在18世纪已开始打坝淤地。山西省离石县佐主村回千沟的淤地坝有 150余年的历史。引山洪漫淤河滩荒地在中国的历史也很悠久。欧洲阿尔卑斯山区早在 500年以前就开展了荒溪治理工作,以减轻山洪及泥石流灾害。当地农民利用干砌块石、原木、铁丝石笼等材料修建谷坊、拦沙坝,固定沟床,缓洪拦沙。日本在1689年开始设置防御泥沙机构,制定水土保持方案,兴修山溪水土保持工程。美国的沟道水土保持工程主要有谷坊及护岸工程,其目的在于控制沟蚀的发展。作用 ①固定或抬高沟道侵蚀基准面,制止沟底下切;②减小沟道纵坡、减缓山洪速度及其冲刷力;③拦蓄或调节山洪或泥石流中的固体物质,防止或减轻泥沙灾害;④合理利用水沙资源,除害兴利。种类 主要有下列类型。①沟头防护工程:防止沟头溯源侵蚀。②谷坊:按建筑材料又可分为土谷坊、石谷坊、土石谷坊、插柳谷坊、混凝土谷坊等。③拦沙坝:按建筑材料又可分为土拦沙坝、土石拦沙坝、浆砌石拦沙坝、铁丝石笼坝、混凝土拦沙坝、钢索拦沙坝等;按拦蓄及调节泥沙的功能,可分为完整坝与开口坝。开口坝中有格栅坝、孔口坝、缝隙坝等坝型。④淤地坝。⑤山洪及泥石流排导工程。⑥沉沙场。⑦护岸工程:包括导流堤、丁坝、护岸堤等。设计要点 淤地坝及小型水库一般由坝体、泄水洞和溢洪道三部分组成,其防御洪水设计标准决定于工程的等级。库容为 1~10万m3的水库按一遇洪水设计,50年一遇洪水校核;10~50万m3的水库按10~一遇洪水设计,50~100年一遇洪水校核。山洪及泥石流排导槽的设计标准,要保证排导槽在多年运行中,不出现因淤积和冲刷危害建筑物安全的现象。在布置排导工程时,要使导流堤和过流建筑物上游端与稳定的流通区出口相接,顺应沟口流势,呈直线或大半径曲线布置。紧接导流堤的急流槽或束流堤作成直线或大半径曲线,与排洪建筑物相交处不要突然放宽或缩窄。在过流建筑下游段,如急流槽不直通河道,泥石流将在导流堤尾部形成新的堆积,必须慎重选择堆积位置,防止对附近农田或居民区、道路带来危害。如修建急流槽将泥沙直接输入河道,应力求使堤尾方向与河道流向以锐角相交,以利泄洪排沙。为避免河道经常顶托形成溯源淤积,急流槽尾部应高于下游河道25年一遇洪水位。在排导工程的纵坡与断面设计中,对于束流堤,只要求约束流路,防止漫流。其纵坡一般就采用堆积面的纵坡,断面形状可根据地形条件确定。对于排导槽,要求不发生淤积作用,应根据山洪及泥石流特征设计相应的纵坡与断面宽深比,为排走山洪及泥石流中的固体物质创造水力条件。参考书目尾张安治著:《实用砂防工学》,再版,朝仓书店,东京,1956。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。